Tenant Improvement Work
Construction at SL Green Realty Corp. is a simple structured process. Each step is accompanied with a letter clearly outlining the next steps, as well as the construction guidelines that your firm must follow.
The process is as follows:
The process is as follows:
- The tenant submits drawings for review to the following parties:
- Property Manager: John Flaherty
- Chief Engineer: Nick Ricigliano
- Construction Assistant/Vice President of Construction: Christine Vuljaj/Robert DeWitt & Roger Merriman
- Reviewing Engineers for Comments:
- MGJ Associates (MEP)
- Severud Associates (Structural)
- Moed de Armas & Shannon (Redevelopment Architect)
- Robert Director Associates (Redevelopment Engineer)
- The Construction Administrator issues Letter 1, which outlines additional materials required:
- Additional drawings (Architectural, Structural, HVAC, Electrical, Plumbing, Sprinkler, Fire Alarm)
- General Contractors Insurance & Indemnification Agreement
- Permit Expeditor assigned by SL Green to property: Milrose Consultants
- The expeditor assigned by SL Green MUST be used unless stipulated otherwise in the lease.
- Permit applications submitted by the building assigned expeditor for VP signature
- The reviewing engineer(s) & PM submit comments to CA/VP. The comments are reviewed and Letter 2 is sent with said comments attached. Letter 2 must be signed and returned by the tenants.
- The tenant must resubmit drawings, conforming to the Reviewing Engineer's & PM's comments, to PM, CE, & CA/VP. If all comments are addressed and CA & PM have copies of Contractors Insurance & Indemnification Agreement as well as the appropriate permits, Letter 3 is issued, granting final approval. All subsequent coordination, scheduling, access, etc. must be arranged through the Property Manager.
- Project begins; SLG inspects construction site periodically.
- Note: For additional information please refer directly to your lease.